Applicants & Property Owners with Pending Building Department Violations

Building Department Requirements

Options:

  1. Apply For A Building Permit And Submit The Following Documentation:
    1. As-built survey of property.
    2. Submit the necessary working drawings for all work performed without the required building permit (two sets).
    3. Submit letter certifying the work signed and sealed by a registered architect or engineer.
    4. Obtain demolition permit; if zero-lot-line must comply with Ordinances 93-14 and 95-17.
    5. Retention swale (drainage) may be required.

  2. Apply for a demolition permit, remove all new construction built without the required building permit and request all required inspections.